Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the factoryplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/inkgteur/inkgreentechnical.com/wp-includes/functions.php on line 6121
Our Projects – Ink Green Technical Services L.L.C
+97 1503548481
info@inkgreengroup.com
Musaffah Shabiya - ME-9 - Abu Dhabi

Our Projects

[vc_row][vc_column][vc_column_text]


Guggenheim Museum Project Abu Dhabi


Drydocks World Dubai


Ali & Sons Marine Engineering Factory


Fujairah F2 Power and Water Facility, Fujairah


Goltens Engineering Shipyard Dubai


Al Dhafra solar project is a 2GW photovoltaic (PV) independent power producer (IPP) project, Abu Dhabi


Dubai 700MW CSP + 250MW PV Hybrid IPP Project at Mohammed bin Rashid Al Maktoum Solar Park , DUBAI


150MIGD Umm Al Quwain Independent Water Project


Construction of (02B+G+2) shopping mall on Plot No. 24-001, Nadd Hessa, Dubai Sillicon Oasis, Dubai, UAE


Design, Supply and Installation of FCD 1st Stage Duct Burners and gas baffles of HRSG 71 & 72 at ‘L’ Station Phase 1, DEWA, JABEL ALI


Removal, Sandblasting and Installation of 18″NG Pipeline in ‘E’ Station, DEWA, JABEL ALI


Metito Overseas Limited, National Industries Park, Dubai, UAE


DUABI HASSYAN CLEAN COAL POWERPLANT , DUBAI


Binghatti industries Ltd Factory Dubai Silicon Oasis, Dubai


Platinum, Diamond, Sapphire Building Projects, Sillion Oasis, Dubai


Jebel Ali Refinery Expansion, ENOC (EPCL) , DUBAI, JEBEL ALI


Haleeba Filelds Development PROJECT Al Asab, Abu Dhabi


Al Dabb’iya Surface Facilities – Phase 3 Project, Al Dhabiya, Abu Dhabi


Skilled Manpower Services for Powerstation Equipment Overhaul Works at D,E,G,H,K,L & M Stations


The Satah-al-Razboot (SARB) offshore oilfield Project, Zirku Island, Abu Dhabi


The Address Hotel Fountain Views Project, Dubai Mall, Dubai


EGA Expansion Project, Al Taweela Alumina, Taweelah Abu Dhabi


Jewel of the Creek Project, Diera, Dubai


Boiler Work at S-1 Shweihat Powerplant Abu Dhabi


Supply of Skilled Manpower Services for Power Station Equipment Overhaull Works at D,E,G,H,K,L &M Stations DEWA ,JABEL ALI


Mirfa Independent Water & Power Plant (IWPP), Mirfa Abu Dhabi


Dismantling, Fabrication, Testing & Installation of the LFO High Rack Pipeline in ‘E’ Station, DEWA, JABEL ALI


Inco Internation al Workshop, JABEL ALI, DUBAI


AL ZAHRA FEWA POWER & DESALINATION PLANT AJMAN


INTER REFINERIES PIPELINES LL PROJECT (IRP 2) – MUSSAFAH


LAMPRELL ENERGY HAMRIYA FREE ZONE SHARJAH


ADGD CONSTR. SHAH GAS EPC 2 – 3


HABSHAN GASCO IGD 5


Structure Works for Unit 719, Shah Gas, Abu Dhabi


MIRFA TO RUWAIS PIPELINE FOR NITROGEN SUPPLY, Abu Dhabi


FEED GAS IMPROVEMENT PROJECT, Habshan, Abu Dhabi


ag_projekte_full_57_1.jpg

BOROUGE 3 RUWAIS ABU DHABI PROJECT, RUWAIS, ABU DHABI

[/vc_column_text][/vc_column][/vc_row]